← All locations

EV Charger Installation in New York

New York's NYSERDA rebate stacks with the federal 30C tax credit, bringing real out-of-pocket costs well under $500 for many homeowners. NYC has higher labor costs — plan for the higher end of the range.

  • $400–$1200

    Installation Range

  • $700

    Average Cost

  • $1500+

    Potential Savings

  • Required

    Permit

Installation Cost in New York

Most New York homeowners pay between $400 and $1200 for a complete Level 2 EV charger installation, with a typical job landing around $700. This includes labor, materials, and permit fees — but not the charger itself ($300–$800 additional).

Costs at the high end usually involve a longer conduit run from the electrical panel, an outdoor weatherproof installation, or a panel upgrade if your existing panel is already at capacity.

New York EV Charger Rebates & Incentives

Federal 30C Tax Credit — Available to All New York Residents

The federal government offers a 30% tax credit (up to $1,000) on the cost of your EV charger and installation. This is a dollar-for-dollar reduction on your federal tax bill — not a deduction. Claim it on IRS Form 8911 when you file taxes.

New York State Rebate — Up to $500

NY State Energy Research and Development Authority (NYSERDA) offers up to $500 for Level 2 EV charger installation through the Drive Clean Rebate program.

Utility Rebates in New York

  • Con Edison: Up to $250 for smart Level 2 charger
  • National Grid: EV charging TOU rates available
  • PSEG Long Island: Up to $200 for EV charger installation

Utility rebate programs change frequently. Get a free quote and we'll confirm which rebates are currently available in your zip code.

Most Popular EVs in New York

Knowing which EV you drive helps installers spec the right charger. The most popular EVs in New York are:

  • Tesla Model 3
  • Nissan Leaf
  • Chevy Bolt
  • Tesla Model Y

Any Level 2 charger on our comparison page works with all of these vehicles.

Do You Need a Permit in New York?

Yes — New York requires an electrical permit for Level 2 EV charger installation in most jurisdictions. Permit fees typically run $50–$200 and are usually handled by your electrician. A permit ensures the work is inspected and up to code, which matters for homeowner's insurance and future home sales.

Ready to get installed in New York?

Get a free, no-obligation quote from a licensed local installer. Most homeowners hear back within 1 business day.